Johns By John

Recent Work

The Part Nobody Ever Sees.

Once the ground is graded back, a good install and a bad one look identical from the driveway. So here is what it looks like before the dirt goes back on.

Crew setting a new septic tank with a mini excavator

New Installation

Full System Install

Tank set, drain field built and distribution box leveled on a new residential build. Site graded and passed inspection first time.

Hernando County

Underground cutaway of a septic system

System Cutaway

How A System Sits

Lift station, two chamber tank, distribution box and field, laid out the way we build them.

Reference

Johns By John pump truck on a residential job site

Service Call

Scheduled Pump Out

Routine pump out on a residential system, both chambers emptied and the filter cleaned while we had the lid open.

Brooksville, FL

Photo Needed

Wide shot of an open drain field trench with new lines laid in

Drain Field

Drain Field Replacement

Failed field removed and rebuilt with new distribution lines and clean stone.

To be confirmed

Photo Needed

Close shot of the open lift station with the new pump and panel

Lift Station

Lift Station Rebuild

New pump, float assembly and control panel on a system that could not move water uphill.

To be confirmed

Photo Needed

Job site photo of the larger tank being set

Commercial

Commercial System

Larger capacity system sized for a business property with heavier daily flow.

To be confirmed

Placeholder tiles are waiting on job photos. Locations and details to be confirmed before launch.

Every Job

Graded Back Before We Leave.

Every project on this page ended the same way: lids sealed, trenches filled, ground leveled and the site raked clean. That last hour is the one most crews skip, and it is the one homeowners remember.

See What We Do

Your Project Next.

Free on site estimate. We will walk the property with you.